We will support your business
Distribution and supply of electricity
PPS is the owner and operator of the local distribution system. Industrial park is connected to the superior system with two connectors 110kV V 8881 a V 8882. Transformer station with the possibility of max. 50MW connection is equipped with two transformers as follows: T 101 110/23/6,3kV 25/25/15 MVA type ETR31M-0 – 2015 T 102 110/6,3kV 25MVA typ 8ERH 31 M-0, – 1987 The original HV distribution system is built on a voltage level of 6.3 kV. Reconstruction of the supply fields and transformers in 2015 made it possible to connect to the area distribution system HV 22 kV

Distribution and supply of natural gas
Industrial park Štúrovo is connected to a natural gas distribution network through high-pressure gas feeder RS 15000/2/1-Qmax= 15 000 Nm3/h. The local distribution system operated by the company Priemyselný park Štúrovo, a.s. also consists of medium pressure natural gas distribution at a pressure of 250 kPa with diameter DN 50 to DN 300 in total length approx. 4,200 meters. At present, only 15% of the total capacity of the gas pipeline is being used.

Distribution of drinking and process water, waste water treatment plant
Drinking water is supplied from the city’s drinking water distribution. Supply of the site by process water is from the river Danube after the mechanical treatment of water. Mechanical, aerobic and anaerobic treatment stage: 10 000 m3 / day, recipient: Danube,:10 000m3/day. Drainage of sewage, technological and rainwater is done through a single sewer for treatment: DN2400 / 1500.

We manage a complex web of transport, logistics, industry and energy.
Parameters of port: The total usable length of the port is 200 meters, with the possibility of extension up to 1 km. The port is connected to the railway network of the industrial park. Parameters of railway siding: The PPŠ siding is connected to the international railway line IV. The corridor leading from: Dresden – Kuty – Bratislava – Sturovo - Istanbul We are especially focused on the development of last – mile connection, connecting the national rail network via the port network to the private terminal siding.